Système intégré de gestion ouvert et multiplateformes des marchés publics
Publié le 03-09-2025 à 20:11
Support : support@armp.cm Plateforme : pridesoft@armp.cm
COMMUNE DE KUMBO
PROCUREMENT OF SMALL WORKS   KUMBO COUNCIL INTERNAL TENDERS BOARD  REQUEST FOR QUOTATIONS NO. 012/RFQ/KC/KCITB/MINDDEVEL/ PROLOG/ NWR/ 2025 OF 29TH AUGUST 2025 FOR THE CONSTRUCTION OF A BRIDGE OF 5M SPAN AND DEPTH OF 4.5M OVER RIVER SHWAI ON THE RIBAH-MBOTONG-SHISONG ROAD IN KUMBO MUNICIPALITY, BUI DIVISION OF THE NORTH WEST REGION
Source de financement
BANQUE MONDIALE(BM)
1.Objet New(Additif)

The Government of the Republic of Cameroon has obtained from the World Bank, IDA Credit Agreement No. 72130 – CM to finance the cost of the LOCAL GOVERNANCE AND RESILIENT COMMUNITIES PROJECT (PROLOG) and intends to use a portion of the amount of this credit to make the authorized payments under the Contract for which this Request for Quotations is published.

2.Consistance des prestations New(Additif)

  The Mayor of Kumbo Council now invites Contractors to submit their Quotations for the Works. To this end, the Kumbo Council intends to use part of the sums granted under this agreement to make the payments provided for under the contract relating the construction of a bridge of 5m span and depth of 4.5m over River Shwai on the Ribah-Mbotong-Shisong road in Kumbo Municipality, Bui Division of the North West Region

3.Participation et origine New(Additif)

In case the Contractor is a joint venture (JV), all members shall be jointly and severally liable for the execution of the entire Contract in accordance with the Contract terms. The JV shall nominate a representative who shall have the authority to conduct all business for and on behalf of any and all the members of the JV during the Request for Quotations process and, in the event the JV is awarded the Contract, during contract execution.

4.Financement New(Additif)

World Bank

5.Consultation du Dossier New(Additif)

Invited eligible Bidders may obtain further information from Kumbo council Building, Cell Phone: +237670003577, PO BOX: 03, Kumbo; and inspect the bidding document during office hours, Monday to Friday between 9am and 3pm (GMT+1).

As soon as the invitation to tender is published, the contract award documents (tender’s file) will be made available to all bidders, either at their request to the Kumbo Council or the PROLOG PMU/RCU or via the internet link indicated in the invitation to tender.

6.Acquisition du Dossier New(Additif)

All bids will be accepted only if they present a receipt for payment of 30,000 CFA francs per, non-refundable, to the treasury of Kumbo Council.

Tenders must be delivered to Kumbo Council, Cell Phone: +237670003577, PO BOX :03 Kumbo located at Tobin, no later than 23/09/2025 at 10 Am Prompt, in seven (07) copies (including one (01) original and six (06) copies plus a USB key containing the digital PDF and editable version) in sealed envelopes marked:

 

“REQUEST FOR QUOTATION NO. 012/RFQ/KC/KCITB/MINDDEVEL/PROLOG/NWR/2025 OF 29TH AUGUST 2025 FOR THE CONSTRUCTION OF A BRIDGE OF 5M SPAN AND DEPTH OF 4.5M OVER RIVER SHWAI ON THE RIBAH-MBOTONG-SHISONG ROAD IN KUMBO MUNICIPALITY, BUI DIVISION OF THE NORTH WEST REGION”

 

7.Remises des offres New(Additif)

Invited eligible Bidders may obtain further information from Kumbo council Building, Cell Phone: +237670003577, PO BOX: 03, Kumbo; and inspect the bidding document during office hours, Monday to Friday between 9am and 3pm (GMT+1).

As soon as the invitation to tender is published, the contract award documents (tender’s file) will be made available to all bidders, either at their request to the Kumbo Council or the PROLOG PMU/RCU or via the internet link indicated in the invitation to tender.

All bids will be accepted only if they present a receipt for payment of 30,000 CFA francs per, non-refundable, to the treasury of Kumbo Council.

8.Delai de Livraison New(Additif)

  The execution period for the works is Three (03) months.

9.Ouverture des Plis New(Additif)

Quotations will be opened by the Kumbo council internal tenders board immediately after the deadline for the submission of Quotations.

10.Critères d'évaluation New(Additif)

Quotations will be evaluated to ensure the technical proposal's compliance.

·         Verification that the Quotation Letter is properly completed, dated, and signed with the signatory's name and title;

·         Verification that the Unit Price Schedule and the Quantitative and Descriptive Quote are duly completed, dated, and signed;

·         Evaluation of the technical qualification of each admissible bid according to the bid evaluation grid; [Insert the following if there are multiple lots: “Quotations will be evaluated lot-wise, taking into account discounts offered, if any, after considering all possible combination of lots”.                               

 EVALUATION GRID

Description

NOTATION

1

Presentation of the offer

 

Compliance with the order prescribed in the RFQ with separators

Yes/No

Readability and numbering

Yes/No

2

References in similar projects

 

List of references for the last 5 years (dates)

Yes/No

Provided with at least 2 references of similar works completed (justified  with the first and last page of the contract + acceptance report or certificate of completion)

Yes/No

3

Quality of personnels

 

Works director ; At least a Bachelors civil engineering with at least five year of experience

Yes/No

Site foreman : At least a higher national diploma in civil engineering with at least three year of experience

Yes/No

NB : for every  « yes » obtained, it must be justified with a certified copy of the diploma, and identity document with a signed and dated.

 

 

 

4

SITE Equipments/ tools

 

At least a pick-up with its identification documents (certified copy of owner ship documents or a certified copy of the rental contract/agreement)

Yes/No

List of small equipment consistent with the tasks (produce photocopies of purchase invoices or rental invoices)

Yes/No

6

Methodology for carrying out the work

 

Detailed technical note concerning the organization of the work

Yes/No

Description of socio-environmental protection rules (environmental protection, safety, health, and hygiene of site personnel)

Yes/No

Detailed work schedule with deadlines ≤ one hundred and twenty days  (120) days

Yes/No

7

Special technical clauses booklet, initialed on each page, dated and signed on the last page

Yes/No

8

Environmental and social clauses booklet, initialed on each page, dated and signed on the last page

Yes/No

 

Special administrative clauses booklet, initialed on each page, dated and signed on the last page

Yes/No

9

Site visit report

(justified with a with photos and a thorough description of the site)

Yes/No

 

Total

….. /15

 

NB: Only bids with a total of 12 out of 15 yes votes will be accepted for the next stage of the procedure.

·         Verification of arithmetic operations, multiplying unit prices by quantities where applicable and using the price in words to make any necessary corrections;

·         Preparation of a summary table of quotations based on the amounts corrected for any arithmetic errors, listed in ascending order.

For the purposes of evaluation and comparison, the currency(ies) of the quotations must be converted into the same currency. The currency to be used for comparison purposes to convert the proposed prices, expressed in various currencies, into the comparison currency at the selling exchange rate will be the following: CFA franc (XAF). The source of the exchange rate is the Bank of Central African States (BEAC). The exchange rate date is: twenty-eight (28) days before the date of submission of offers. (NB: If the reference currency is not quoted on this date, the exchange rate will be that of the last previous day quoted.).

. For technically compliant Quotations, the total evaluated prices, excluding provisional sums and any provision for contingencies, but including work in-house when their prices are established competitively, will then be compared to determine the lowest evaluated price(s).

11.Attribution New(Additif)

        [Select either of the two options below]

            [Option 1- For Single Lot  

The Contract will be awarded to the Contractor who meets the eligibility requirements in accordance with the RFQ, offers the lowest evaluated price/s, offers a technically compliant quotation, and guarantees completion of the Works by the specified date.

         [Option 2- For Multiple Lots  

1.      The contracts will be awarded to the Contractor or Contractors meeting the eligibility requirements in accordance with the RFQ, offering a technically compliant quotation, guaranteeing completion of the Works by the specified date and offering the lowest evaluated price to the Employer for combined lots.”]

2.      The Employer shall invite by the quickest means [e.g. e-mail] the successful Contractor/s for any discussion [this is expected to be virtual in light of the emergency situation] that may be needed to conclude the contract or otherwise for contract signature. 

3.      The Employer shall communicate by the quickest means with the other Contractors on its contract award decision. An unsuccessful Contractor may request clarifications as to why its quotation was not determined to be successful.  The Employer will address this request within a reasonable time.

4.      The Employer shall publish a contract award notice on its website with free access, if available, or in a newspaper of national circulation or UNDB online, within 15 (fifteen) days after award of contract. The information shall include the name of the successful Contractor, the Contract Price, the Contract duration, summary of its scope and the names of the Contractors and their quoted and evaluated prices.

12.Renseignements Complémentaires New(Additif)

Invited eligible Bidders may obtain further information from Kumbo council BuildingCell Phone: +237670003577, PO BOX: 03, Kumbo; and inspect the bidding document during office hours, Monday to Friday between 9am and 3pm (GMT+1).

As soon as the invitation to tender is published, the contract award documents (tender’s file) will be made available to all bidders, either at their request to the Kumbo Council or the PROLOG PMU/RCU or via the internet link indicated in the invitation to tender.

 

BAMENDA Le 29-08-2025
Le MAYOR
MBORONG VENASIUS BONGKIYUNG